FUJAIRAH ADVENTURE PARK

SCOPE :

DESIGN
FABRICATION
INSTALLATION
CONSTRUCTION

Warrior Group delivered the second phase of Fujairah Adventure Park in 2023, completing the full construction scope in under six months. This rapid build-out demonstrates our capability to execute complex adventure infrastructure within challenging natural terrain and tight timelines.

The project introduced iconic adventure attractions, including the GCC’s highest Giant Swing, a high-speed zipline, a multi-use adventure tower with climbing wall and bag jump, as well as dedicated archery and axe throwing ranges. In parallel, critical park infrastructure was delivered to ensure safe operations, smooth visitor flow, and long-term durability.

Sustainability and local impact were key priorities, with 100% of materials sourced regionally, 90% eco-material usage, and full reliance on locally hired labor. All works were executed with 100% preservation of key natural terrain and a zero-incident safety record.

Since its launch, the Fujairah Adventure Park expansion has enhanced the emirate’s adventure tourism offering, drawing both local and international visitors and setting a benchmark for safe, high-quality adventure destination development in the region.

PRODUCT DELIVERED: Giant swing, zipline, archery range, ax throwing, adventure tower, climbing wall, bag jump
USE OF LOCAL MATERIALS: 100 % of materials sourced regionally
SUSTAINABILITY: Eco material usage at 90%
TERRAIN PRESERVATION: 100% preservation of key natural features
LOCAL EMPLOYMENT: 100 %
SAFETY RECORD: Zero incidents